{"id":981,"date":"2016-12-19T20:27:48","date_gmt":"2016-12-19T20:27:48","guid":{"rendered":"https:\/\/spiperformancecoatings.com\/?p=981"},"modified":"2018-03-25T22:29:36","modified_gmt":"2018-03-25T21:29:36","slug":"penguin-pool-fit-amazing-animals","status":"publish","type":"post","link":"https:\/\/spiperformancecoatings.com\/penguin-pool-fit-amazing-animals\/","title":{"rendered":"A penguin pool fit for amazing animals"},"content":{"rendered":"

For years now, the festive period has gone hand-in-hand with our nation’s love for animals. Whether they’re jumping on trampolines (yes, we’re talking about that<\/i> advert) or bringing to life the latest feel-good winter blockbuster \u2013 have you ever wondered where these animals are trained?<\/p>\n

The answer is Amazing Animals<\/a>, in Chipping Norton and we’ve been assisting them in the creation of a brand new penguin pool.<\/p>\n

You can’t keep celebrity penguins waiting<\/h4>\n

Like any asset, the training facility needed their penguin pool back up and running as quickly as possible (they are celebrity penguins after all!), which is why they were sold on our fast return to service performance coatings solutions. Usually, a newly formed concrete asset needs around 28 days to dry out before any treatments can be applied to the surface. This was too long for Amazing Animals, but luckily we had a solution.<\/p>\n

Here’s a quick rundown of the process:<\/p>\n